As per our experience we found that most of the projects get drifted from the planned goals due to improper requirements collection, challenges in technology and/or changes in end user requirements. We have measures to identify each of the root causes and we offer remedy in time.
The life cycle of a project can be grouped into six phases: Project Startup, Business Requirements Gathering, Design, Implementation, Testing and Project Completion.
At Venus Informatics, we embrace the best practices and collective knowledge of the finest industry standards, well-defined and proven models for the software development, enhancement, porting and conversion to ensure defect free and on time delivery of the projects.
The Process Models followed at Venus Informatics are:
The development methodology at Venus Informatics meets the needs of MIL-STD-498 and IEEE 982.1. We use a repeatable software development process and a well proven testing methodology based upon the V-Model and the Iterative model.
A derivative of waterfall model, V-model is used for development and testing. The trained engineers are matured to execute each of the activities in a systematic manner meeting the stringent quality control requirements. Established templates and checklists used at each stage of the project make sure that the development is as per the requirements.
Process Model consists the following phases:
- Proposal
- Project startup and functional specifications
- Design and program specification
- Coding and unit testing
- Integration testing
- System testing
- Acceptance testing and Project completion
Our experienced team carefully manages each and every phase. Each model is indicative of the phases in which the project is to be executed.
|
|